← All comparisons

Chevy Equinox EV vs Toyota bZ

Price, range, charging speed and what each costs to run, side by side.

Quick answer

  • Lowest price: Toyota bZ, from $34,980.
  • Longest range: Chevy Equinox EV, up to 319 miles.
  • Quickest fast charging: Toyota bZ: 10–80% in ~30 min.
  • Cheapest to charge at home: Toyota bZ, about $54 a month (a 28-mpg gas car: about $121).

Side by side

Chevy Equinox EVToyota bZ
Starting price$34,995$34,980
EPA range307–319 miles236–314 miles
Winter range (about 20% less)~246–255 miles~189–251 miles
Body styleMidsize SUVMidsize SUV
Battery85 kWh74.7 kWh
Efficiency3.3 mi/kWh3.4 mi/kWh
Home charging cost~$56/month (5.6¢/mile)~$54/month (5.4¢/mile)
Level 2 at home11.5 kW · ~30 mi/hr11 kW · ~30 mi/hr
DC fast chargingUp to 150 kWUp to 150 kW
10–80% fast charge10–80% in ~42 min10–80% in ~30 min
PlugCCS plugNACS (Tesla) plug
300-mile road trip1 stop, 17 min charging · ~$241 stop, 15 min charging · ~$22

Which one fits you

Pick the Chevy Equinox EV if…

  • ✓ range matters most: up to 5 more miles on a charge

Pick the Toyota bZ if…

  • ✓ you want the lowest price: from $15 less
  • ✓ you road-trip: fast charging 10–80% about 12 minutes quicker
  • ✓ you want the cheapest running costs: about $2 a month less to charge at home
  • ✓ you want Tesla Superchargers without an adapter

Which one fits how you actually drive?

Specs don’t say whether a car works with your charging and your week. Answer 5 quick questions and see which electric cars match your driving, what they’d cost you to charge, and how often you’d need a fast charger.

Check your EV readiness →

Charging cost where you live

The figures above use the U.S. average electricity rate. Each car’s page links to its cost in your state:

Other comparisons

Base MSRP before incentives. Ranges are EPA estimates across each model’s trims. Running costs assume 1,000 miles a month at the U.S. average of 18.4¢/kWh. The road trip uses each model’s longest-range version on the highway in summer, leaving home full, charging 10–80% at $0.50/kWh. Fast-charging times are the makers’ claims or estimates noted on each model page.